For Energy Assessors

Part O assessment that fits your assessor workflow.

Sit Part O cleanly between your SAP, BREL and as-built deliverables. Per-window Appendix D Equivalent Area calculations, branded reports and the audit-quality workings Building Control expects from an assessor.

  • Per-window Appendix D Equivalent Area engine
  • Part Q restrictor and security adjustment built in
  • Branded report with assessor name, qualification & registration number
  • Save unlimited assessments to your account dashboard
Start an assessor-grade report

Why other Part O tools frustrate assessors

You are signing your name to the report. You need the underlying workings to be defensible - not a black box.

1

Hidden Equivalent Area maths

Most tools quote a free area number without showing the Appendix D opening-angle factor. Ours shows the full per-window workings, every time.

2

No assessor signature block

Building Control wants your name, qualification and registration number on the report. We have a dedicated assessor profile section.

3

Re-keying data from SAP

You have already entered floor area, glazing and ventilation strategy for SAP. We let you reuse a saved project as a template for the Part O run.

Built for the assessor in mind

Designed by reviewing the exact workings Building Control queries, not by guessing what a calculator should output.

Appendix D Equivalent Area engine

Window-by-window calculation with opening type, opening angle, restrictor settings and ground-floor Part Q adjustment fully exposed.

Risk-zone classification (AD-O App. C)

London and central Manchester postcodes classified per AD-O Appendix C Tables - no manual lookup.

Free area / purge ventilation logic

AD-O Tables 1.3/1.4 free area requirements plus the 4% bedroom check and 55%-of-glazing rule, applied automatically.

Account dashboard with templates

Save common dwelling types as templates and apply them across multiple jobs from one assessor account.

Free Tool

Part O postcode risk checker

Find out instantly whether your site falls in a Part O High-risk overheating area. Based on Approved Document O, Appendix C (London Table C1 and Manchester Note C3). No sign-up required.

Risk zones are defined in Approved Document O, Appendix C (2021 edition).

FAQ FOR ENERGY ASSESSORS

Assessor FAQs

Add Part O to your service line in 10 minutes

Set up your assessor profile, run the first job, ship a branded report. No subscription - pay per assessment.

Start an assessor-grade report