For Building Inspectors

Verify Part O reports in seconds.

Every report we issue carries a QR code that links to a public verification page. No log-ins, no chasing assessors - confirm the report is genuine and review the workings in a single scan.

  • QR-verifiable cover page on every report
  • Public verification page confirms the report has not been altered
  • See risk zone, methodology and outcome at a glance
  • Underlying workings follow AD-O 2021 line-by-line
Try the verification page

What we built specifically for Building Control

A regulator needs to know two things fast - is this report genuine, and does the maths check out. We answer both.

1

Spoof-able PDFs

Anyone can edit a PDF. The QR on our cover page points at our own verification record - one scan tells you the report exists in our database.

2

Black-box calculations

We expose every step: risk-zone lookup, AD-O Table reference, per-window Equivalent Area workings, bedroom free area check. Nothing hidden.

3

Inconsistent report layouts

Our reports follow the same structure: project particulars, regulatory basis, dwelling summary, room schedule, compliance determination, scope & limitations.

How verification works

A two-step verification flow built for the realities of a Building Control inbox.

Step 1 - scan the QR on the cover page

Phone camera, no app. The QR opens our public verification page directly - no log-in, no account.

Step 2 - read the verified summary

Project name, address, postcode, risk zone, outcome, methodology and issue date - all confirmed from the original assessment record.

Methodology is transparent

Reports cite Approved Document O Tables 1.1, 1.2, 1.3, 1.4 and Appendix D directly. Every limit is sourced.

Same data the assessor saw

The verification page reflects the live assessment record. No risk of an altered PDF showing a different result to what was actually calculated.

Free Tool

Part O postcode risk checker

Find out instantly whether your site falls in a Part O High-risk overheating area. Based on Approved Document O, Appendix C (London Table C1 and Manchester Note C3). No sign-up required.

Risk zones are defined in Approved Document O, Appendix C (2021 edition).

FAQ FOR BUILDING INSPECTORS

Building Control FAQs

Already have a Part O report to verify?

Scan the QR on the cover page or visit partouk.com/Verify and enter the verification token printed on the report.

Try the verification page